
| SidePlate Systems, Inc. Henry Gallart, M.S.S.E. President |
“4D is currently doing one of the most complicated structures SidePlate Systems, Inc. has been involved with to date due to its unique geometry..4D's dedication, diligence and understanding of the SidePlate Frame systems has made it a joy in working with them.” |  | Schuff Steel Company Rowland Schroeder Subcontract Manager |
“The company’s performance has proven success in their demonstration of accuracy and professionalism. I highly recommend 4D Steel Detailing as a valuable resource.” |
 | SteelFab Stuart R. Sherrill President (SteelFab Alabama) |
“We are pleased to report that 4D did an excellent job from a quality control and schedule standpoint while having to incorporate numerous design changes.” | | Owen Steel Company Inc Ray Clarke Engineering Manager |
“4D’s quality work and sensitivity to fast track schedules help make projects a success. Their willingness to accommodate fabricators and erectors specific needs coupled with timely submittal schedules is also evident. Their in-depth knowledge of steel fabrication and erection is obviously founded on a sound base of experience.” |
| Helmark Steel Inc Dominick D’Antonio, P.E. Vice President/Chief Engineer |
“4D’s quality drawings and sensitivity to our needs as a fabricator and erector, as well as the fast track schedules under which we work, is second to none. They have demonstrated excellence in all that they do, and a willingness and flexibility to work as a member of a larger team.” |  | Cives Steel Company-Northern Tyler Estabrooks Project Manager |
"I'd like to thank you and your staff for all the hard work and effort being done on this project. I'm sure it looks like we are very demanding but I would have no problem using 4D on any of my projects in the future.” |
 | Powell Steel Corporation Mark E. Henry Operations Manager |
“They consistently meet or beat their submittal dates. 4D also works extremely well with design changes than most other detailers. They handle them very proficiently and to the extra mile to minimize schedule impact”
|
|